NEW QUESTION # 30
Analytics charts are created by the user in the Advanced Analytics application.What can the user do in the Advanced Analytics app?Note: There are 2 correct answers to this question.

  • A. Open graphics in Excel.
  • B. Merge charts together.
  • C. Group data.
  • D. Apply filters on your data.

Answer: C,D


NEW QUESTION # 31
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.Which of the following parameters can you model to plan production with extra shift(s)?

  • A. Adjusted production interactive values
  • B. Incremental production values
  • C. Capacity expansion with additional costs
  • D. Production source validity at the start of seasonal peak

Answer: C


NEW QUESTION # 32
Which of the following approaches could you take to reduce run times of an optimizer?Note: There are 3 correct answers to this question.

  • A. Split into multiple planning areas to support weekly vs. daily planning needs.
  • B. Increase the use of incremental lot size beyond the frozen horizon.
  • C. Keep the number of fairshare segments small.
  • D. Avoid using telescopic time buckets.
  • E. Use non-overlapping networks by using subnetwork ID maintained at Location-Products to reduce the size of the problem.

Answer: A,D,E


NEW QUESTION # 33
What actions can be performed in the Advanced Dashboards application?Note: There are 3 correct answers to this question.

  • A. Use drill-down functionality.
  • B. Rename the charts.
  • C. Display all assigned analytics on a single UI.
  • D. Link two analytics charts.
  • E. Add process templates.

Answer: A,C,E


NEW QUESTION # 34
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note: There are 2 correct answers to this question.

  • A. Change the numbering hierarchy of the period IDs in the time profile.
  • B. Change the description of the attributes in the time profile.
  • C. Add a new time profile level to the time profile.
  • D. Change the past and future horizon of the levels in the time profile.

Answer: B,D


NEW QUESTION # 35
Which of these conditions must be met to create a Local Member key figure?Note: There are 2 correct answers to this question.

  • A. A key figure is selected in the Key Figures tab in the SAP IBP, add-in for Microsoft Excel.
  • B. Use Excel Cell References in the Report Editor option is selected.
  • C. Activate Local Member Recognition setting is selected.
  • D. Users should have authorization for template administration.

Answer: C,D


NEW QUESTION # 36
Which of the following data inputs, when increased, will always cause an increase in the safety stock outputs when the Global (multi-stage) Inventory Optimization operator is run?Note: There are 2 correct answers to this question.

  • A. Minimum Lot Size
  • B. Holding Cost Percentage
  • C. Target Service Level
  • D. Transportation Lead Time Error CV

Answer: A,C


NEW QUESTION # 37
You are developing the functionality and appearance of the Excel UI for SAP IBP business users.Which extensibility capabilities for SAP IBP, add-in for Microsoft Excel are provided by Custom VBA coding?Note: There are 2 correct answers to this question.

  • A. Changing the entries from the Name Manager
  • B. Changing the member names
  • C. Changing the layout of the master data workbooks
  • D. SAP IBP ribbon extension

Answer: C,D


NEW QUESTION # 38
What are the S&OP operator (optimizer) parameters associated with demand fair share?

  • A. Number of fair share segments Maximum days of coverage Number of fair share segments late delivery
  • B. Number of fair share segments Additional tiering costs (default) Inventory days of supply
  • C. Number of fair share segments Additional tiering costs (default) Number of fair share segments late delivery
  • D. Number of fair share segments Additional tiering costs (default) Maximum inventory

Answer: C


NEW QUESTION # 39
You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed?Note: There are 2 correct answers to this question.

  • A. Prioritization of demand elements one by one is achieved by unconstrained heuristics.
  • B. Finite heuristics can achieve demand prioritization and pegging.
  • C. Planning results can be generated faster by the optimizer.
  • D. Push and Pull production models are used by the optimizer.

Answer: B,D


NEW QUESTION # 40
You set up time-series integration using Cloud Integration for Data Services. During the integration process of master data, an error occurred. In the Data Integration app the job failed with status "Fatal Error". How can you find more details about the error?

  • A. Navigate to the Master Data Workbook in Excel and open the Log.
  • B. Download the Rejection Report in the Data Integration app.
  • C. Navigate to the Manage Master Data app and open the Log.
  • D. Download the Initial Problem Report in the Data Integration app.

Answer: C


NEW QUESTION # 41
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note: There are 2 correct answers to this question.

  • A. If necessary target key figures values are disaggregated.
  • B. If necessary source key figures values are disaggregated.
  • C. Copying multiple key figures can be processed sequentially.
  • D. Copying multiple key figures on different planning levels is not possible.

Answer: B,C


NEW QUESTION # 42
Which of the following are functions of SAP IBP for demand?Note: There are 2 correct answers to this question.

  • A. Embedded, on-the-fly demand analytics
  • B. Demand sensing of demand data using predictive analytics tools
  • C. Consideration of demand-driven analysis for buffer positioning.
  • D. Detailed statistical analysis of demand data using predictive analytics tools

Answer: A,D


NEW QUESTION # 43
Using the import/export functionality means working with groups of items that are organized into collections.What is the best practice for managing collections?

  • A. A planning area with its time profile must be bundled in one collection.
  • B. A planning area with the copy operators assigned must be bundled in one collection.
  • C. Configuration items should be bundled in the collections based on the SAP IBP project stream.
  • D. You should delete collections after they have been transported.

Answer: A,B


NEW QUESTION # 44
A time profile is defined with these levels: day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?

  • A. IF("PERIODID3" ="$$PERIODID3CU$$...)
  • B. IF("PERIODID2" ="$$PERIODID2CU$$...)
  • C. IF("PERIODID4" ="$$PERIODID4CU$$...)
  • D. IF("PERIODID5" ="$$PERIODID5CU$$...)

Answer: A


NEW QUESTION # 45
For which of the following application jobs can you enter planning filters as parameters?Note: There are 2 correct answers to this question.

  • A. Purge Master Data
  • B. Create Time Periods for Time Profiles
  • C. Purge Key Figure Data
  • D. Purge Non-Conforming Data

Answer: A,C


NEW QUESTION # 46
You create a planning filter using an SAP IBP Fiori app.Which of the following objects can it be applied to?Note: There are 2 correct answers to this question.

  • A. Jobs in the Applications Jobs app
  • B. Planning view templates in the SAP IBP add-in for Microsoft Excel
  • C. Snapshot operator in the SAP IBP add-in for Microsoft Excel
  • D. Supply chain graph in Supply Chain Network app

Answer: A,B


NEW QUESTION # 47
You need to use your resource cost effectively with a certain minimum use, even if it means producing more than demand.Which solutions would apply to this scenario?Note: There are 2 correct answers to this question.

  • A. Minimum capacity utilization will result in pull production occurring.
  • B. Capacity leveling will be possible for production and storage resources.
  • C. Balance can be achieved between excessive prebuild and minimum use by incorporating violation costs.
  • D. Excess stock can be generated and will need to be staged in an overflow warehouse.

Answer: C,D


NEW QUESTION # 48
......