[Feb-2022] CTAL_TM_001 Dumps Full Questions - ISQI Certifications Exam Study Guide [Q25-Q46]

Share

[Feb-2022] CTAL_TM_001 Dumps Full Questions - ISQI Certifications Exam Study Guide

Exam Questions and Answers for  CTAL_TM_001 Study Guide


How to study the CTAL-TM Exam

There are two main types of resources for preparation of CTAL-TM certification exams first there are the study guides and books that are detailed and suitable for building knowledge from ground up then there are video tutorials and lectures that can somehow ease the pain of through study and are comparatively less boring for some candidates yet these demand time and concentration from the learner. Smart Candidates who want to build a solid foundation in all exam topics and related technologies usually combine video lectures with study guides to reap the benefits of both but there is one crucial preparation tool as often overlooked by most candidates the practice exams. Practice exams are built to make students comfortable with the real exam environment. Statistics have shown that most students fail not due to that preparation but due to exam anxiety the fear of the unknown. ValidTorrent expert team recommends you to prepare some notes on these topics along with it don’t forget to practice CTAL-TM dumps which had been written by our expert team, Both these will help you a lot to clear this exam with good marks.

 

NEW QUESTION 25
Which of the following team roles would be most appropriate to enhance the team and why? 2 credits

  • A. A quality assurance officer
  • B. A person with in-depth technical skills
  • C. A person who brings new ideas to the team
  • D. A person with the ability to complete tasks

Answer: C

Explanation:
Explanation/Reference:
Explanation:

 

NEW QUESTION 26
Which of the following would be the TWO most appropriate examples of entry criteria documented in the system integration test plan? 2 credits

  • A. The availability of the latest version of the capture-replay tool (for testing the interface with the newly developed test management tool).
  • B. The percentage of decision coverage achieved during unit testing.
  • C. The percentage of requirements coverage achieved during system integration test.
  • D. The sign-off of a performance test software release note (test item transmittal report) by both development and testing showing that system performance meets the specified acceptance criteria.
  • E. The percentage of acceptance test procedures scheduled for execution.

Answer: A,B

 

NEW QUESTION 27
IEEE 1028 also defines "management review" as a type of review. What is the main purpose of a management review? 1 credit

  • A. Establish a common understanding of requirements
  • B. Provide independent evaluation of compliance to processes, regulations, standards etc.
  • C. Align technical concepts during the design phase
  • D. To monitor progress, assess the status of a project, and make decisions about future actions

Answer: D

 

NEW QUESTION 28
Regarding the process described above, what is the most important recommendation you would make using IEEE 1044 as a guide? 2 credits

  • A. No priority or severity assigned
  • B. No classification on type of incident
  • C. Incident numbering is manual rather than automated
  • D. No mentioning of reproduceability

Answer: A

Explanation:
Topic 12, Scenario 12 "Automatic Teller Machine (ATM)"
You are a test manager in charge of integration, system and acceptance testing for a bank. You are working on a project to upgrade an existing ATM to allow customers to obtain cash advances from supported credit cards.
The system should allow cash advances from EUR20 to EUR500, inclusively, for all supported credit cards. The supported credit cards are American Express, VISA, Eurocard and Mastercard.
In the master test plan the following items are listed in the section named "items and/or features to be tested":
I All supported credit cards
II Language localization
II Valid and invalid advances
IV Usability
V Response time

 

NEW QUESTION 29
Which THREE activities would be valid steps during the development of the test strategy?2 credits (2 out of 3 correct 1 credit)

  • A. Define test career paths
  • B. Identify test staff members that will be involved in the system test
  • C. Issue the test strategy document for review
  • D. Assess the testing that needs to be done to minimize the risks
  • E. Perform a project risk analysis
  • F. Define a master test plan template
  • G. Understand the software development life cycle used by the software house

Answer: C,D,G

Explanation:
Explanation/Reference:
Explanation:

 

NEW QUESTION 30
The development manager is managing the review of the responses received from bidders, and has asked the in-house test manager to provide a review checklist for the test management aspects of the responses. Which of the following checkpoints would be appropriate? 2 credits

  • A. The bidder's project test plan depicts a phased implementation with later delivery dates to be confirmed and states that test deliverables will be developed using IEEE 829 as a guide.
  • B. The bidder's test plan shows that the application will be delivered for acceptance in six months time.
  • C. The bidder's test policy should enforce that incident management fully conforms to IEEE 1044.
  • D. The bidder's project strategy shows that the data content of all the test environments conforms to EU standards.

Answer: A

Explanation:
Explanation/Reference:
Explanation:

 

NEW QUESTION 31
A number of options have been suggested for the level of independence to be employed for the testing on the next project, and are shown below.
i. External test specialists perform non-functional testing.
ii. Testing is outsourced.
iii. Testing is carried out by the developer.
iv. A separate test team carries out the testing.
v. Testing is performed by the business.
vi. Testing is performed by a different developer.
Which of the following orders the above in a correct order of independence? 1 credit

  • A. ii, i, v, vi
  • B. i, iv, v, vi
  • C. ii, v, i, iii
  • D. i, ii, iv, vi

Answer: A

Explanation:
Explanation/Reference:
Explanation:

 

NEW QUESTION 32
During test process improvement it is recommended to use standards where possible. Standards originate from various sources and they cover different subjects in relation to testing Pick TWO sources of software standards, useful to software testing from the ones mentioned below. 1 credit

  • A. IEEE 829 'standard for software test documentation' is an international standard to be following mandatory by all testing origination regardless of lifecycle models.
  • B. SY-395-01 'Standard for East Coast Hospital software' is a regional standard adapted from a national one. Besides hospital software, this standard ought to be used also by other types of software system in the region.
  • C. ISA 4126-1 'Software engineering- Product quality Part 1:
    Quality model' is an international standard, that provides a basis on which to define quality assurance solutions.
  • D. BS-7925-2 'Software testing. Software component testing is a national standard used internationally. It covers a number of testing techniques that may be useful both on component testing level and on system testing level.
  • E. ISO 9126-1 'Software engineering- Product quality Part 1:
    Quality model' is an international standard, that provides a basis on which to define quality assurance solutions.

Answer: D,E

Explanation:
Explanation/Reference:
Explanation:

 

NEW QUESTION 33
A number of options have been suggested for the level of independence to be employed for the testing on the next project, and are shown below.
i. External test specialists perform non-functional testing.
ii. Testing is outsourced.
iii. Testing is carried out by the developer.
iv.
A separate test team carries out the testing.
v.Testing is performed by the business.
vi. Testing is performed by a different developer.
Which of the following orders the above in a correct order of independence? 1 credit

  • A. ii, i, v, vi
  • B. i, iv, v, vi
  • C. ii, v, i, iii
  • D. i, ii, iv, vi

Answer: A

 

NEW QUESTION 34
Select THREE issues from the options provided that should at least be raised. 1 credit

  • A. Has there been sufficient comparison of tools?
  • B. Is customized training available?
  • C. How will the change process be managed?
  • D. How will the implementation be organized?
  • E. Do we have a set of tool requirements to validate the tool against?
  • F. What are the problems we are trying to address?
  • G. Which project will be selected to perform the tool pilot?

Answer: A,E,F

 

NEW QUESTION 35
Why might a RAD approach be a better option for the test manager rather than a sequential development? 2 credits

  • A. More time can be spent on test execution as less formal documentation is required.
  • B. Time-box constraints will guarantee code releases are delivered on schedule.
  • C. It will extend the development team's abilities and enhance future delivery capabilities.
  • D. It will allow the marketing, clerical and testing staff to validate and verify the early screen prototypes.

Answer: D

Explanation:
Explanation/Reference:
Explanation:

 

NEW QUESTION 36
Risks should be constantly reviewed. Given the current situation, which one of the following factors is most likely to lead to a revised view of product risk? 3 credits

  • A. The concerns over the user interface raises the likelihood of a risk in that area and increases the amount of test effort needed for the user interface, thereby limiting the test effort available for other parts of the test management tool.
  • B. The delivery of the application without the interface changes may upset the user community.
  • C. The method used for test estimation is not accurate enough and hence the money spent on testing exceeded its budget.
  • D. The concerns over the user interface may lead to changes to the interface which cannot be implemented by development in time for the second test iteration.

Answer: A

Explanation:
Explanation/Reference:
Explanation:

 

NEW QUESTION 37
Which of the following are valid reasons for adopting a different life cycle (from the V model), for increments after the first year? 2 credits
i. We do not have a clear understanding of the requirements from a customer perspective.
ii. We see the risk of delivering requested functionality late as being higher than the risk of delivering a lower quality product.
iii. We do not have a budget for additional regression testing which is needed to ensure that existing functionality is not compromised by future iterations.
iv.
The company test strategy does not fit well within the V life cycle model.

  • A. (i) and (iv)
  • B. (i) and (ii)
  • C. (ii) and (iii)
  • D. (ii) and (iv)

Answer: B

 

NEW QUESTION 38
Which aspect in the test estimate is the main risk in this project? 1 credit

  • A. Unknown input quality due to third party development
  • B. Availability of end-users
  • C. The costs of hardware and tools
  • D. Quality of the specification

Answer: A

Explanation:
Topic 8, Scenario 8, V2 "Test Proems Improvement'
You have raised the issue that improving the testing process is also dependent on the status of the software development process.

 

NEW QUESTION 39
Which of the following would you least expect to form part of the analysis of initial tool costs? 1 credit

  • A. Evaluation of suitable tools
  • B. Tool portability
  • C. Learning time required to use the new tool
  • D. Integration with other tools

Answer: B

Explanation:
Topic 4, Scenario 4, V2 "Test Management Tool"
The project situation after 11 months is:
-
The first increment was released one week late but contained sufficient functionality to be declared fit for purpose'. However, there were 20 outstanding incidents deferred to increment two.
-
The amount of voluntary overtime worked PV the test team has reduced the second Increment slippage to just 3 weeks.
-There is talk of reducing the scope of requirements. The purpose of this is to first deliver the application with support for manual testing and then to provide a delivery * weeks later to resolve any remaining points and provide support for automated testing (i.e. the link to the capture-replay tool).
-Concerns have been expressed by a section of the user community, that in some places the usability is very poor.

 

NEW QUESTION 40
You have been asked to write a testing strategy for the company. Which statement best explains how risk can be addressed within the testing strategy? 1 credit

  • A. A test strategy is the result of a project risk analysis and defines the approach and resources for testing.
  • B. A test strategy should address identified generic product risks and present a process for mitigating those risks in line with the testing policy.
  • C. A test strategy is derived from the test policy and describes the way risk assessments are performed in projects.
  • D. A test strategy identifies the specific product for a project risk and defines the approach for the test project.

Answer: B

 

NEW QUESTION 41
You have investigated different possibilities and selected four of them to present to IT management. Which of the proposals will you most likely give your highest recommendations? 3 credits

  • A. Solution from a tool vendor offering to educate two test team members in the use of their easy-to-use test automation capture replay tool over the first 3 month and based on that build the regression test suite. In addition to Vicki, Steve is the only one that has time available to be educated.
  • B. Internal offer from the development department of XYZ to create the regression package using CppUnit as test automation tool. One of the development groups have very good experiences in automating unit tests, and they are willing to do training as well.
  • C. Outsourcing of test automation based on an offer from an Asian company, AsiaAutoTest, which has people who are specialists in system level capture-replay automation tools. They also offer training and besides they offer to run and maintain the regression tests in the future.
  • D. Insourcing of test automation based on an offer from a local company ABC that has people who are specialists in system level capture-replay automation tools and they also do regular training courses in test automation methods and tools. They can then work closely with Vicki.

Answer: D

 

NEW QUESTION 42
Which of the following is a characteristic of good testing in any life cycle model? 1 credit

  • A. Each test level has test objectives specific to that level.
  • B. Analysis and design of tests begins as soon as development is completed.
  • C. Some, but not all, development activities have corresponding test activities.
  • D. All document reviews involve the development team.

Answer: A

 

NEW QUESTION 43
Which one of the following estimation approaches is appropriate at this stage of the project? 2 credits

  • A. Create an estimate based on the credentials of the successful bidder
  • B. Create an estimate based on the complexity of the code
  • C. Create an estimate based on the function point analysis technique and test point analysis
  • D. Create an estimate based on a percentage of the development effort

Answer: C

 

NEW QUESTION 44
Why might a RAD approach be a better option for the test manager rather than a sequential development? 2 credits

  • A. More time can be spent on test execution as less formal documentation is required.
  • B. Time-box constraints will guarantee code releases are delivered on schedule.
  • C. It will extend the development team's abilities and enhance future delivery capabilities.
  • D. It will allow the marketing, clerical and testing staff to validate and verify the early screen prototypes.

Answer: D

 

NEW QUESTION 45
Which of the following would be the most significant input to estimating the time to carry out the specified testing tasks? 3 credits

  • A. The metrics recorded from testing the capture-replay tool.
  • B. The number of testers in the company and their grade.
  • C. The standards used for the requirements specification.
  • D. The skills and experience of developers to correct the failures.

Answer: A

 

NEW QUESTION 46
......


CTAL-TM Certification Path

6 months of experience in Software development/software testing. Successful completion of the ISTQB Certified Tester Foundation level and a minimum of three years testing experience is recommended. The Intermediate Certificate may also be helpful but is not required.


What is the duration, language, and format of CTAL-TM Exam

  • Format: Multiple choices Questions
  • Passing score: 65%
  • Language: English
  • Length of Examination: 180 minutes
  • Number of Questions: 65

 

ISTQB Certified Tester Advanced Level - Test Manager Free Update With 100% Exam Passing Guarantee: https://troytec.validtorrent.com/CTAL_TM_001-valid-exam-torrent.html